More FAQs- How long will it take to have my floors coated with acrylic?
- How long does it take to get my upholstered furniture at my office professionally cleaned?
- Do all staff receive training and development?
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
Total cleaning time depends on the cleaning process used and the amount of time needed for the upholstery to dry. The technician will give you an estimated cleaning time prior to service.
All managers and supervisors receive ongoing and comprehensive training on the management of the sites they are allocated. All cleaning staff receive in-house and on-site training on process, products and equipment needed to carry out their given duties. All Health and Safety issues and company policies are covered in their initial induction with annual refresher training, as needed.