FAQs
More FAQs- What does your post construction cleaning service involve?
- How long will it take to have my floors coated with acrylic?
- Is drying and curing the same thing?
We provide the detailed cleaning that is needed after the construction work is completed and all construction debris has been removed. This is the final step prior to turning the building over to the owner. NOTE: Construction clean-up is divided into two categories: rough clean-up and final clean. ServiceMaster Clean focuses on the final clean. Rough clean-up is the removal of construction debris and is often done by the contractor. ServiceMaster Clean does not do rough clean.
Preparation will depend on the condition of the existing floor, current number of coats, repairs required, etc. When applying an acrylic finish, stripping of the old finish is usually necessary. When that’s the case, finish removal plus the application of 3 coats of finish requires 1 hour for every 150 square feet of flooring. Generally, 3 coats of finish are required to achieve the desired effect. If a floor does not require stripping, it can generally be shower scrubbed which is a procedure used for preparing a floor for receiving a new layer of finish. Once that has taken place, a floor can be recoated at anywhere from 4,000 to 6,000 square feet per hour.
No. Drying means that the surface layer is no longer wet or damp to the touch. Curing, on the other hand, means that acrylic has reached its maximum hardness thereby providing the necessary protection of your flooring.